Client:

Travelodge Hotels Limited

Role:

Contract Administrator

Description:

Wakemans Building Surveying Team were appointed as Contract Administrators to manage this project on behalf of Travelodge Hotels Limited. The existing hotel required extensive works to preserve its grade II listed facade, windows and architectural stonework, which was showing significant deterioration and structural damage due to factors related to weather damage, age the hotel’s general state of repair.


Following an extensive survey recommendations were made to repair any damage, preserve architectural features, and enable a plan of ongoing maintenance to the exterior of the hotel.


Wakemans managed a major programme of works to the building including: significant structural repairs, replacement of sections of existing steelwork, the provision of new thermal insulation to wall cavities, re-cladding, re-roofing, replacement and repair of bay windows, canopies and repair to architectural ironwork. The interior of the hotel had suffered water damage and therefore the hotel needed refurbishment throughout many rooms.  The contract value of these works was £700,000.

 

Client:

Worcestershire County Council

Role:

Quantity Surveyor

Description:

Wakemans undertook this project on behalf of Worcester County Council, whilst engaged on their professional services framework as Quantity Surveyors.
The £2.8 m new build facility provides the school with eight state of the art laboratories, a science preparation room, a professional development room for staff and student teachers, offices and independent learning spaces for Post 16 students.

bewdley_science

The professional team included: Architects Jacobs and Main Contractors Kier Construction.

 

 

Client:

Joseph Leckie Academy Trust

Role:

Quantity Surveyor

Description:

Wakemans were retained on this project in the role Quantity Surveyor by the Joseph Leckie Academy Trust. This new build development provides new community and teaching accommodation over three floors.

Designed by Seymour Harris Architecture the building is sited in the grounds of the existing Joseph Leckie Academy in Walsall and provides the Academy with an additional 16 classrooms and 6 IT rich classrooms, enabling the school to offer additional places to serve the local community.

The project has a contract value of £3.3m.  Wakemans have been retained to work on further phases of the scheme.

JosephLeckie
The Joseph Leckie Academy – Photograph courtesy of Seymour Harris Architecture.

 

Client:

Level Healthcare Limited

Role:

Project Manager, Quantity Surveyor, Employers Agent, CDM Consultant and BREEAM Assessor.

Description:

Wakemans were employed by Level Healthcare Ltd as Project Manager, Quantity Surveyor, Employers Agent, CDM Consultant and BREEAM Assessor on this £6m development.

The completed project provides a new multi-user Primary Care Centre offering the community a range of health services under one roof.  Three GP practices provide patient services from the Centre that also accommodates a Dental practice, Pharmacy and Opticians. In addition to dedicated clinical rooms the Centre offers a range of multi-user clinical facilities and meeting rooms within the 3,300m² floor area.

The project was brought to a successful conclusion following the appointment of MAC Construction Solutions Ltd a construction management company who were engaged after the main Contractor went into liquidation.

Newbury_Health_Centre2

 

Client:

Bidvest

Role:

Employer’s Agent, Quantity Surveyor and CDM Advisor.

Description:

This 117,400 ft² development has provided Bidvest* with a new multi-temperature food storage and regional distribution centre with an integral head office; enabling the company to relocate their offices from High Wycombe.


The project was split into two contracts initially this involved the shell build, core and partial fit out of M&E to the offices for which Wakemans acted as Tenant’s Representative administering the Lease Agreement and managing Bidvest led enhancements to the base build. Careful programme management enabled the fit out works to the food storage and warehouse facilities to overlap the base build of the scheme; with the fit out let as a £6m Design and Build contract for which Wakemans were engaged by Bidvest as a multi-disciplinary consultant providing a range of services to include Employer’s Agent, Cost Consultant and CDM Advisor.


The fit out works included £2.6m of refrigeration works and an M&E package amounting to £1.6m. Practical Completion was achieved on 6th June 2016.

Bidvest_Slough


Wakemans also managed the interface with Bidvest in-house team ‘Bidvest Direct’ for the fit out of 3 no. kitchens and warehouse racking. Notably the fit out works comprised of the provision of a state of the art ground floor presentation kitchen and dining area for Bidvest clients; as well as bespoke interior design and specialist joinery and fittings to office ‘huddle’ areas, meeting rooms and coffee lounge.


*Bidvest sell and deliver multi-temperature food, equipment and non foods to the hotel and catering industry across the UK.

 

Client:

Kier Property

Role:

Employer’s Agent, Quantity Surveyor, CDM Consultant

Description:

The Walsall Waterfront comprises of a multi-screen cinema at the first and second floor of the building with ground floor retail units. The development is located alongside the canal and represents a significant regeneration scheme in the area aimed at providing the Walsall community with new and attractive leisure facilities. The cinema is operated by The Light Cinema and opened its doors in March 2016.

Light_Cinema_Walsall-GreenRoom


The project has a contract value of £6.5m.

 

 

Client:

REID Lifting

Role:

Employer’s Agent, Quantity Surveyors and BREEAM Advisors

Description:

Wakemans were retained on this project as Employer’s Agent, Quantity Surveyors and BREEAM Advisors by REID Lifting a global company that specializes in the design and supply of lightweight portable gantry and davit cranes.

The project involved the new build development of a £2.6 million warehouse, distribution and office project located at Newhouse Farm Industrial Estate, Chepstow. The building was designed to achieve a BREEAM standard of ‘Very Good’.

The completed 32,500ft² development has allowed REID lifting to relocate to a purpose built facility that has become its UK headquarters, the new building has provided REID with extra space to allow the company to make improvements to their UK operations by increasing efficiency and productivity. A project has also included a second 15,000ft² speculative building.

 

Client:

MOOG Controls Limited

Role:

Employer’s Agent, Cost Consultant and CDM Advisor

Description:

Wakemans were appointed on this project to construct a new office and production facility at Tewkesbury for Moog Controls Ltd, a leading designer, manufacturer, and integrator of precision control components.

Wakemans acted as Employer’s Agent, Cost Consultant and CDM Consultant on the 44,000 ft2 project, which will expand Moog’s existing facilities at Ashchurch Industrial Estate.

The expansion project has enabled MOOG to improve its service to its customers and to sustain business growth and indicates another positive indication of the recovery within the economy and in particular for the construction industry.

Gateway 12, Waterwells Business Park, Gloucestershire

Role:

Employer’s Agent, Quantity Surveyors and CDM Consultants

Description:

Wakemans were employed as Employer’s Agent, Quantity Surveyor and CDM Consultant on this £3m project involving the construction of a 41,000 ft² industrial / warehouse unit. The scheme also included the development of a new access road and preliminary ground work in preparation for Unit 3 the second phase of the scheme.

The Units form a part of the £22m Gateway 12 development located on Waterwells Business Park in Gloucestershire.

 

Gateway-12-Arial

Unit 2 is a two storey building with 40,913 ft² industrial / warehouse space with a 8m clear internal height and office accommodation that can be tailored to occupier’s requirements.

 

Role:

Employer’s Agent, Quantity Surveyors, CDM Consultants and BREEAM Assessors.

Description:

This project involved the construction of a new 60,000 ft² warehouse and two-storey office facility located at the Skypark development in Exeter.

The Geopost centre is one of a number of ‘super depots’ being constructed to replace a smaller regional centres.  The Centre was designed to achieve a BREEAM Excellent environmental rating.

Skypark represents a major development plan and the Geopost project is a part of the initial phase of the development, therefore the project included significant infrastructure works including drainage work and the provision of services to the site and including the construction of a new access road part of a 278 agreement with Devon County Highways.

Geopost_Skypark

The completed scheme has a contract value of £4m.