Tre Ifan, Caergeiliog

Award-Winning Sustainable Homes

Project overview

This project involved the construction of 6 two-bedroom affordable semi-detached dwellings that were designed and built to achieve the Passivhaus Standard, delivered with Wakemans acting as Quantity Surveyor on the development.

These homes are also created to rigorous energy efficient design standards. They maintain an almost constant temperature through both efficient insulation and ventilation, thus costing the tenants with virtually no heating costs. They were built to high eco standards, reducing carbon emissions along with an EPC A rating.

This project was the first Local Authority led housing scheme to use both Welsh timber and volumetric construction, utilising Welsh supply chains within a 50-mile radius.

This scheme also won the National Offsite Project of the Year Award.

Wakemans role

Employer's Agent

Quantity Surveyor

Health and Safety Advisor

£0

Contract Value

0

Homes

This scheme proves that Passivhaus performance and affordability can go hand in hand, with local supply chains and offsite manufacturing keeping costs firmly under control throughout. The result is a scheme that delivers exceptional long-term value; near-zero heating costs for tenants and a National Offsite Project of the Year Award to show for the approach.

Dylan Morris, Divisional Director

Similar Projects.

High Street, Bangor

Providing 12 flats for those at risk of homelessness

A collaboration with Adra, Cyngor Gwynedd, and North Wales Housing this new build project is located on previously disused land.

St David’s Hospice, Llandudno

A multi-phased project of refurbishment and remodelling

Carried out in phases to minimise disturbance for residents and maintain safe occupation and use throughout the works.

Travelodge National Refit Programme

Multi-million-pound Investment Across UK Hotels

A national multi-million-pound refit for Travelodge, refreshing hotels to a new premium standard with project and cost management services. With phased works delivered in live environments, the programme enhances sustainability, comfort and style while hotels remain open and trading.

Long Marston & Meon Vale

A Multi-Phase Residential Development

Meon Vale, one of the developments within this wider area, is a 1,350-home mixed-tenure scheme spread across 220 hectares. A shared access road, a strategic Greenway and local shops tie the whole area together, and Wakemans has played a direct role in bringing these to life.

Slate Quay, Caernarfon

A unique multi-million pound regeneration to a historic harbour front in Caernarfon

Wakemans acted as Project Manager and Cost Consultant on this unique regeneration, transforming a derelict site in the heart of Caernarfon.

Southam Community Centre

A Community Centre delivered with Project Management and Quantity Surveying

A 27-week programme to deliver a new facility with a large hall, kitchen and meeting room at a Taylor Wimpey development in Southam.

Get in touch.