Our projects.
Here you'll find a selection of our projects to show the breadth of what we do and the strength of our relationships. From complex builds to public realm schemes, we’re proud of the results we help deliver.
Central Approach, Bristol
Delivering Quality with Sustainability
Wakemans acted as Cost Consultants, Employer's Agent and CDM Principal Designer on this project consisting of two brand new distribution industrial units. One of which was pre-let to Oxford Instruments, while the second was delivered on a speculative basis to provide flexible space for future occupiers.
Morrison Crescent
A Planned Maintenance Regeneration
Wakemans helped to deliver a planned maintenance project for the Isle of Anglesey County Council for a total of 29 residential homes in a cul-de-sac in Holyhead.
Gladstone’s Library, North Wales
Roof and Building Restoration Work
Major restoration and structural repair works at Gladstone’s Library, preserving this Grade I listed landmark through roof refurbishment, ground stabilisation, and Victorian Cupola restoration while remaining fully operational throughout.
Indurent Park, Tamworth
Delivering Sustainable Industrial Regeneration
Indurent Park, Tamworth is a multi-phase industrial and logistics development. The scheme delivers 7 high-quality, sustainable units alongside enhanced occupier amenities, creating a modern and future-ready business environment.
Southam Community Centre
A Community Centre delivered with Project Management and Quantity Surveying
A 27-week programme to deliver a new facility with a large hall, kitchen and meeting room at a Taylor Wimpey development in Southam.
Slate Quay, Caernarfon
A unique multi-million pound regeneration to a historic harbour front in Caernarfon
Wakemans acted as Project Manager and Cost Consultant on this unique regeneration, transforming a derelict site in the heart of Caernarfon.
Tre Ifan, Caergeiliog
Award-Winning Sustainable Homes
Wakemans acted as Quantity Surveyor and Principal Designer, assisting to deliver 6 affordable homes designed and built with sustainability in mind.
Long Marston & Meon Vale
A Multi-Phase Residential Development
Meon Vale, one of the developments within this wider area, is a 1,350-home mixed-tenure scheme spread across 220 hectares. A shared access road, a strategic Greenway and local shops tie the whole area together, and Wakemans has played a direct role in bringing these to life.
Pilkington Automotive
Delivering Expansion and Refurbishment Works Within a Live Manufacturing Environment
The project enhanced office and warehouse spaces while ensuring uninterrupted manufacturing throughout, alongside improvements to external infrastructure including parking, service yard alterations, and a new gatehouse.
Travelodge, Bermondsey
Delivering Infrastructure-Sensitive Development in Bermondsey
Travelodge Bermondsey is a modern, sustainably designed hotel development, with Wakemans playing a key role as Tenant's Agent in delivering engineering solutions and supporting the project’s successful integration alongside complex railway infrastructure.
Travelodge, London Docklands
Supporting Tenant Delivery at London Docklands
The Travelodge London Docklands scheme involved the delivery of a modern hotel within a highly constrained, urban environment. Acting on behalf of the tenant, Wakemans provided strategic oversight to ensure the project was delivered efficiently, safely, and in line with operational requirements.
Indurent Park, Gloucester
Delivering Sustainable Industrial Regeneration
Indurent Park, Gloucester is a multi-phase industrial and logistics development combining greenfield expansion with the regeneration of the former Quedgeley East Trading Estate. The scheme delivers high-quality, sustainable units alongside enhanced occupier amenities, creating a modern and future-ready business environment.
Office Development, Sandvik Halesowen
New Office and Showroom Development
New Cat B offices, showroom and car parking to be occupied by Sandvik Coromant a global company supplying tooling solutions to the world’s engineering industries.
High Street, Bangor
Providing 12 flats for those at risk of homelessness
A collaboration with Adra, Cyngor Gwynedd, and North Wales Housing this new build project is located on previously disused land.
St David’s Hospice, Llandudno
A multi-phased project of refurbishment and remodelling
Carried out in phases to minimise disturbance for residents and maintain safe occupation and use throughout the works.
DHL Distribution Depot, Hortonwood, Telford
New build distribution centre
£7.2m development of a single storey building with two-storey offices provides 55,000 sq. ft to provide a new build distribution centre, pre-let to DHL.
Project Porth, Newport – high tech manufacturing and research and development
National Constructing Wales Award 2025
The Project Porth development represents a multi-million-pound investment by international high-tech manufacturing and research & development company, KLA U.K.
Point 36, Capitol Park Goole, East Riding, Yorkshire
High specification distribution facility
The Siemens Mobility site represents a state-of-the-art train manufacturing and servicing facility, of significant importance to supporting future rail travel throughout the UK.
Wellington House, Speke, Liverpool
Condition Survey and Asset Advice
Condition survey of an industrial warehouse near Liverpool Airport, carried out for Indurent. Wakemans assessed the roof and cladding, advised on treatment options and provided feasibility advice to extend the life and value of the asset.
Tesla Showroom, Bristol
Condition Survey
Survey for a future Tesla showroom in Bristol, undertaken on behalf of AC Lloyd ahead of their acquisition. Wakemans inspected all key building elements including roof, walls, finishes and M&E systems, providing a clear picture of the property’s condition.
Travelodge National Refit Programme
Multi-million-pound Investment Across UK Hotels
A national multi-million-pound refit for Travelodge, refreshing hotels to a new premium standard with project and cost management services. With phased works delivered in live environments, the programme enhances sustainability, comfort and style while hotels remain open and trading.
Swansea.com Stadium
Lifecycle Maintenance Schedule
Wakemans provide an Annual lifecycle maintenance schedule for Swansea.com Stadium, training ground and ancillary buildings, with clear reports, budget forecasts and a 10-year lookahead to plan investment with confidence.
Longbridge Regeneration Scheme
Transforming a former MG Plant
A major public project in Longbridge, transforming part of the former MG Rover plant. It's now a green community space, with walking routes, road links, play areas, and riverside landscapes.
Indurent Park, Derby
A major five-phase regeneration
A five-phase regeneration at River Derwent Business Park. The 50-acre site includes 10 industrial units and an 887-space multistorey car park, all delivered alongside live business operations.
Amazon Redditch Gateway
Bespoke Sorting Facility
A high-specification sorting facility for Amazon. The site includes extensive warehousing, office space, and infrastructure, with a further £25m of enhancements added post-occupation.
Pets at Home
New Logistics Warehouse
A £30 million distribution centre for Pets at Home, completed in September 2022. The facility supports 800+ jobs and features EV charging, cycle routes, and future-ready infrastructure.