Indurent Park, Gloucester

Delivering Sustainable Industrial Regeneration

Project overview

Indurent Park, Gloucester is a modern industrial and logistics development that reflects a strategic approach to both expansion and regeneration. Delivered across six phases, the scheme combines four initial phases of greenfield development with two later phases focused on brownfield redevelopment, including the remediation of the former Quedgeley East Trading Estate.

The early greenfield phases established the core infrastructure and layout of the park, delivering high-quality industrial units designed to meet modern occupier needs. These phases set the standard for the development in terms of build quality, efficiency, and environmental performance.

The final phases introduced the complexity of brownfield regeneration, with careful remediation enabling previously developed land to be brought back into productive use. This approach demonstrates a commitment to sustainable land use while expanding the overall capacity of the site.

A key feature of Indurent Park is its emphasis on occupier wellbeing and the external environment. The development includes extensive landscaped areas, incorporating over 1,500 metres of Breedon trim-trail. This enhances the visual appeal of the park while providing a valuable recreational amenity for those working on site. Estate-wide CCTV systems further support a safe and well-managed environment.

Sustainability is central to the scheme, with the final phase delivering photovoltaic installations in line with the Indurent Solar Strategy. With a total capacity of 959 kWp, the system supports renewable energy generation and reduces carbon impact. All units achieve BREEAM ratings of “Very Good” or “Excellent”, reinforcing the development’s strong environmental credentials.

 

Wakemans role

Project Manager

Quantity Surveyor

Employer's Agent

Health & Safety CDM Advisor

£0 million

GDV

0ft²

Delivered

0 year

Programme

Through our varying roles, we were able to guide Indurent Park from concept through to completion, ensuring a high-quality, sustainable development that maximises value while prioritising safety, compliance, and long-term performance.

Peter Berndes, Associate Director

Our Projects.

Indurent Park, Derby

A major five-phase regeneration

A five-phase regeneration at River Derwent Business Park. The 50-acre site includes 10 industrial units and an 887-space multistorey car park, all delivered alongside live business operations.

DHL Distribution Depot, Hortonwood, Telford

New build distribution centre

£7.2m development of a single storey building with two-storey offices provides 55,000 sq. ft to provide a new build distribution centre, pre-let to DHL.

Longbridge Regeneration Scheme

Transforming a former MG Plant

A major public project in Longbridge, transforming part of the former MG Rover plant. It's now a green community space, with walking routes, road links, play areas, and riverside landscapes.

Point 36, Capitol Park Goole, East Riding, Yorkshire

High specification distribution facility

The Siemens Mobility site represents a state-of-the-art train manufacturing and servicing facility, of significant importance to supporting future rail travel throughout the UK.

Pets at Home

New Logistics Warehouse

A £30 million distribution centre for Pets at Home, completed in September 2022. The facility supports 800+ jobs and features EV charging, cycle routes, and future-ready infrastructure.

Amazon Redditch Gateway

Bespoke Sorting Facility

A high-specification sorting facility for Amazon. The site includes extensive warehousing, office space, and infrastructure, with a further £25m of enhancements added post-occupation.